$674,000
Expansion Joint Repair Soldier Field House Pool B3236, JBLM, WA
Completion Date
5/06/2022
Perform construction repair services and any associated water removal to remove and replace the existing expansion joint materials and remove and replace the existing pool surface bottom and sidewalls. Repairs also include replacement of existing Anti Entrapment Covers. Clean pool surface and repair / fill of cracks. Buff or mechanically polish the interior pool surface. Deep clean all interior pool deck surfaces. Clean and repaint interior walls.
$560,000
Repair Leaking Walls B774, JBLM, WA
Completion Date
3/08/2022
Repair Leaking concrete walls of Building 774, a 10,000 square foot utility space at Joint Base Lewis McChord. The precast concrete wall cracks were repaired with injected epoxy and all surfaces smoothed for appearance. Exterior rustproof metal siding system including rigid insulation was attached to the main section of the building. Special care was taken to match existing colors and to modify exterior attached accessories and penetrations to work with new siding system.
$6,072,000
Repair Roof VA Puget Sound Healthcare System
Completion Date
09/30/2021
Repair existing roofs on multiple Veterans Administration Health Care buildings at the Seattle campus. Work included demolition and removal of existing roofing, structures and temporarily utility, exhaust fan and other mechanical equipment disconnects and repairing the roofs per the Green Environmental Management System (GEMS). New roofing systems including insulation was installed on flat roofs. The buildings were occupied which required coordination with building managers and attention to noise levels and odor issues due to proximity to air intakes. Enhanced security requirements and coordination were required for access to restricted areas.
$10,987,000
Dry Dock 4 - Repair Main Dewatering Pumps and Valves
Completion Date
5/21/2021
Overhaul three main dewatering pumps and motors, as well as replacing check and discharge valves, and motor controllers which service Dry Dock 4. Repair/overhaul and restore pumps and motor, included tear down of each system, installing new bearings, impeller and rewind of the motors to achieve sustainable operating conditions allowing continued support of docking activities.
$1,038,360
B460 Repair Large Slab Rolling Doors
Completion Date
09/08/2020
This project restored operation of four 60-foot tall large slab rolling doors at the west end of Building 460 in the Controlled Industrial Area (CIA) of the Puget Sound Naval Shipyard. Restoring operation to the doors involved retrofitting/restoring the gearboxes; replacing motors, control equipment, and electrical wiring; and providing new enclosures and appurtenances. Audible and visual signaling systems, limit switches and interlocks were installed to facilitate the safe operation of the doors. Deteriorating door panels were restored and painted inside and out. Broken glass panes were replaced. Replacement of aesthetic features adhered to historical restoration requirements.
$3,132,900
Replace Boilers 1 & 2 at Steam Plant
Completion Date
03/11/2020
Design-Build Replace Boilers 1 and 2 at the Steam Plant, B384 included the design of a new steam system, demolition and removal of two of three 45,000 pounds per hour (pph) (1300 boiler horse power (BHP)) water tube boilers in the central heating plant and installation of two new 20,700 pph (600 BHP) fire tube boilers. Steam service was maintained by the third existing boiler while replacement work was completed. Boiler replacement scope involved structural upgrade of the existing raised concrete floor slab, reconnection of all services, including feedwater, vent piping, fuel piping, and instrumentation.
$1,747,400
Upgrade Tunnel D Electrical
Completion Date
12/28/2017
Design-build electrical upgrade including installation of new explosion-proof (EP) primary power conduits; conductors; EP electrical panels; EP lighting fixtures and power conduits; and EP power receptacles. Design included photometric study to ensure illumination and uniformity criteria were satisfied. Provided temporary power service to maintain operation of critical fuel tank monitoring system during construction.
$1,682,058
Repair HVAC Periscope Shop
Completion Date
6/19/2016
HVAC system upgrade to meet clean room standards. Scope included selective demolition of existing system; installation of new hot/chilled water generating equipment; air distribution ductwork; control systems; equipment support; electrical power and lighting; installation of a new splined panel ceiling and wall repairs; fire protection system revisions; and commissioning.
$2,671,763
Repair Boiler Feedwater System
Completion Date
7/5/2016
Phased replacement of three existing boiler feedwater pumps with 4-stage, horizontal, specialty pumps; provision of one spare pump; installation of 300 LF of new, seismically-restrained and insulated 8"Ø ductile iron pipe main and reconfigured header pipe main manifold; variable frequency drives and controls; and flow meters.
$5,122,378
VA B100 4E MICU/CCU
Completion Date
6/8/2015
Construction of a 12,000 SF Medical Intensive Care/Critical Care Unit in a vacated hospital wing. Facility consisted of 14 patient rooms, 4 isolation rooms, nursing stations, staff conference/break room, administrative offices, and support spaces. Improvements included new mechanical, medical gas, and electrical systems; interior partitions and finishes; service headwalls and booms; and patient lift systems.
$2,943,073
MLA Backlighting
Completion Date
2/13/2013
Design-build replacement of an obsolete quartz halogen backlighting system with a new, energy-efficient LED system for the high-security Main Limited Area (MLA). Design work included engineering and photometrics. Provided new electrical infrastructure to support the four mile perimeter protection system. Phased construction to maintain perimeter protection throughout construction.
$6,857,079
B2050 Medical/Dental Clinic Renovation
Completion Date
4/25/2012
31,750 SF renovation and 3,500 SF addition to a fully operational Medical/Dental clinic. Scope included total HVAC system replacement, repartitioning, interior finishes, and electrical improvements. Concrete and steel addition provided space for administrative offices and medical exam rooms. Extensive phasing and provision of temporary facilities to accommodate ongoing clinic operations.
$1,032,082
Heating Oil Tank Modernizations
Completion Date
9/1/2011
Replacement of nine underground fuel storage tanks with 1000-gal to 5000-gal double-wall tanks. Also replaced four existing above ground tanks. Provided double-wall supply and return fuel line piping and leak detection systems. Site restoration involved asphalt road/parking lot patching; concrete curb, gutter and sidewalk; and hydroseed with temporary irrigation.
$1,026,000
Replace Playground Surfaces, JBLM, WA
Completion Date
5/06/2022
Replace failed or failing rubberized pour-in-place and 24” x 24” rubber tile surfaced at five play areas at various locations around Joint Base Lewis McChord. Playground existing surfaces were demolished and replaced with synthetic grass system with impact attenuation underlayment. Special attention was given to phasing and maintain access to some areas to continue to allow access as well as isolation of the work areas for children safety.
$109,000
Repair Building Envelope B707, JBLM, WA
Completion Date
01/10/2022
Repair Building Envelope J00707 (Historic Building). Repairs consisted of sealing all attic building openings with insulation and sealants. Fabricating and installing covered louvered openings on the Mechanic Room double doors. Installing covers to existing wall openings with galvanized steel sheet and insulation. Installing rigid board insulation in the Mechanical room for improved thermal and noise performance.
$955,000
Repair AHUs - Building 03096, JBLM, WA
Completion Date
8.16.2021
Provided Administrative Building 03096 with a new HVAC heating system consisting of three air-to-air heat pumps and eight variable air volume (VAV) terminal units with electric heat. With a few exceptions, the new equipment and ductwork utilized existing equipment locations and ductwork routing. The new Direct Digital Controls (DDC) were integrated into JBLM’s base-wide DDC system. A phased approach was used to support continuous building use throughout the construction.
$1,200,000
Repair Fender Guide Assemblies Pier 37, Seattle, WA
Completion Date
3/26/2021
Refurbish Fender Guide Assemblies included removal; disassembly; cleaning, repair, and preparation; recoating; reassembly; and reinstallation of 15 fender guide assemblies at Pier 37. This included the complete replacement of all 30 corrosion damaged fender guide pipes on the 15 assemblies and providing new hardware. Project also replaced the existing 5-foot diameter floating fenders with new 8-foot diameter floating fenders along with providing new associated hardware. Dive work was conducted on Pier 36A to install new exothermically welded cathodic protection on and additional 8 fender guides.
$377,171
Environmental Monitoring and Control Upgrade VA Puget Sound
Completion Date
08/20/2020
Project scope involved upgrading the environmental monitoring systems at an operational animal research laboratory at the VA Puget Sound Health Care System’s Columbian Way Campus. Continuous coordination and communication with research staff ensured minimal disruption to laboratory operations. Advance Lighting Modules and temperature/humidity sensors were replaced in 28 different rooms located in three different buildings. System operation was maintained using the legacy control panel until all ALMs and sensors were installed. A new control panel replaced the legacy control panel and provided enhanced reliability and functionality.
$3,263,000
Repair and Replace Stripper Tank System
Completion Date
2/21/2019
Repair of the stripper tank system in Building #2547. Replace existing built in tanks, ventilation, fire protection, electrical system, and piping equipment with code compliant equipment and infrastructure. This includes hazardous materials abatement and disposal.
$11,120,000
Aviation Battalion Headquarters BNHQ
Completion Date
09/20/2018
New construction of an 18,600 SF, 2-story concrete, masonry, and steel headquarters/training facility complete with interior finishes, elevator, radiant hydronic heating, and electrical/low voltage systems. Site development included installation of building power and communication services, extensive site drainage, and concrete and asphalt paving. Achieved LEED Silver certification.
$2,381,375
Replace 2300 Volt Substations
Completion Date
6/15/2016
Provided upgraded electrical inftrastructure to replace three substations at the Puget Sound Naval Shipyard. Provided new transformers, underground electrical distribution, circuit breakers, feeder lines, commissioning of all new equipment items, and associated substation building improvements. Coordinated outages and cut-overs to and from temporary power to facilitate base operations.
$4,544,396
Electrical Distribution NHB
Completion Date
12/22/2015
Upgrade and replacement of critical electrical infrastructure and life safety system elements including new ATS for existing diesel engine emergency generators; UPS system upgrade for phone and information management systems; electrical load redistribution; critical branch circuit installation; Motor Control Center replacement; PA system upgrade; and FA, exit signage, and emergency pathway lighting upgrades.
$1,394,125
Refurbish Track & Field
Completion Date
10/9/2012
Design-build replacement of existing track and field facility using state-of-the-art, SPRINTURF Ultrablade MX™ synthetic turf over a meticulously prepared subgrade with an extensive subsurface drainage system. Worked with the Navy to resolve cost and time impacts associated with unsuitable soil materials encountered beneath a significant portion of the field.
$1,319,872
Install Active Vehicle Barriers
Completion Date
5/25/2012
Design-build installation of two active vehicle barrier systems at the Trident and Trigger base access gates. Designed and installed power, drainage, and control utilities in support of the vehicle barrier systems. Coordinated vehicular and pedestrian traffic control with construction activities to maintain constant access through these two primary base access points.
$604,918
Replace Freight Elevator
Completion Date
9/20/2012
Replaced the existing S-1 freight elevator with a new gearless traction freight elevator complete with modernized safety features and microprocessor controllers. Performed a structural study to assess the existing floor loading capacity in support of the decommissioning and removal of the legacy elevator's hoist and governor assembly, which weighed in excess of one ton.
$3,622,000
Replace Fender Piles on West Side Pier B213, Manchester Fuel Depot
Completion Date
04/20/2022
Design and replace the existing barge fendering system on the west side trestle of the fuel pier at Manchester Fuel Depot. Existing fendering system was removed with special care to prevent injury or damage to the existing work which remained. A new complete fendering system was installed utilizing 20 driven concrete piles 24 inches (square) and a continuous camel log system and arch fenders. The fuel pier and surrounding mooring area remained operational during construction requiring construction phasing.
$290,00
Backflow Prevention for Building Isolation
Completion Date
10/14/2021
Replaced existing domestic water backflow assemblies at the Veterans Administration Puget Sound Health Care System in Seattle with reduced pressure backflow assemblies at two connections to the supply loop. Design changed the existing below grade backflow assemblies with above grade replacements in insulated enclosures.
$11,700,000
Repair CIF Ventilation System, B983, PSNS
Completion Date
9/17/2021
Controlled Industrial Facility (CIF) Building 983 demolition of existing structures on the roof including asbestos and hazardous metals remediation. Installation of a new HVAC system including Stainless Steel ductwork and new air handling units, chillers and exhaust fans. A new raised metal structure platform with a protected roof was installed to house all of the HVAC components with the exception of the chillers.
$2,608,854
Preparation for Installation of the Instrument Landing System
Completion Date
08/20/2020
This design-build project provided preparatory work for the installation of a new Instrument Landing System (ILS). The ILS consists of an antenna system with primary components at two sites (i.e., Glideslope and Localizer) located at opposite ends of the runway. Work at the two sites consisted of removing and disposing of existing antenna equipment and equipment pads; site preparation for new equipment pads; installing underground conduits for power and communications cabling; installing grounding systems; constructing new equipment pads; and paving new access roads. 1,700 LF of underground fiber was installed. 500 LF of power ductbank and three transformers were installed. Airfield markings, signage and installation of new survey monuments for ILS calibrations were also part of the scope this contract.
$2,121,420
Repairs of BUMED Facilities, B993
Completion Date
7/31/2019
Design-build repairs at Naval Air Station Whidbey Island Hospital including: Provision of a new sloped roof structural attic truss over the existing roof of the "Duct House" sheltering multiple electrical conduits. Replace existing roof at the Hospital’s Emergency Management, Linen Inventory, and Mail Room areas. Restore loading dock and construct a ramp providing a warehouse receiving area and emergency egress. Provide three supplemental cooling only units.
$1,255,500
Replace Fire Alarm Systems B7000 & B7001 at NBK Bangor
Completion Date
3/20/2018
Design-build fire alarm replacement of obsolete fire alarm systems in two industrial manufacturing facilities located in lower base (i.e., higher level security) at NBK Bangor. Designed and installed temporary fire alarm systems to enable disabling the existing systems in their entirety. Coordinated construction with various commands within each facility.
$7,099,512
Restore Ventilation NHB B1, Phase II
Completion Date
10/4/2017
Code-required modification and replacement of 7 air handling units (AHUs), 1 heating & ventilation (HV) unit, 19 fans, and 14 pumps on HVAC systems serving administrative areas, operating rooms, exam rooms, laboratories, and service areas. Extensive phasing, infection control, and outage coordination was required to maintain hospital operations.
$7,181,526
Replace HVAC System NHB
Completion Date
10/3/2016
Code-required modification and replacement of 8 air handling units (AHUs), 15 fans, 8 variable air volume (VAV) boxes, and 16 pumps on HVAC systems serving patient care areas and the emergency department. Extensive phasing, infection control, and outage coordination was required to maintain hospital operations.
$3,417,288
Energy Conservation, Phase 3
Completion Date
11/22/2015
Design-build energy conservation project consisting of a combination of lighting and lighting control strategies; HVAC optimization via use of VFDs and controls; water conservation measures; point-of-use hot water heating; thermal envelope upgrades; weatherization improvements; and infra-red heating in 36 different buildings.
$4,187,439
Security Alarm Upgrade
Completion Date
4/17/2015
Design-build upgrade replacement and integration of legacy Access Control Systems (ACS) and Intrusion Detection Systems (IDS) throughout Naval Base Kitsap, Bangor and Bremerton. Scope encompassed networking new ACS and IDS in over 100 different facilities serving over 150 different commands and using the Navy's secure network to connect signals to the Regional Dispatch Center.
$1,310,071
P980 Armory
Completion Date
1/30/2013
Design-build renovation and 2,000 SF cast-in-place concrete addition to convert portions of an existing vehicle garage facility into two separate armories complete with high-severity, bullet-resistant entry doors and weapons issue ports; Class 5A armory vault issue doors; specialized ventilation for weapons cleaning equipment; and administrative and staff offices.
$1,555,251
B19 HIMMS Records & Dispatch
Completion Date
5/9/2011
10,000 SF renovation of the B19 warehouse and conversion to a medical dispatch center and records storage facility complete with administrative offices, patient registration and waiting areas, mailroom, and emergency monitoring and dispatch offices. Complete interior demolition in support of new interior partitioning, finishes, and mechanical and electrical systems.